Connect with us


Plant Construction, Engineering & Components

HiScroll
The oil-free vacuum pumps

Experience the new HiScroll – the oil-free vacuum pumps by Pfeiffer Vacuum in 3D! The HiScroll series consists of three dry and hermetically sealed scroll pumps with a nominal pumping speed of 6 – 20 m³ / h. The pumps are especially characterized by their high performance when evacuating against atmosphere due to their unique features. Their powerful IPM synchronous motors achieve an efficiency that is up to 15% higher than that of conventional drives.

News Plant Construction, Engineering & Components Safety & Security Water & Waste Water

Significant underestimation of flood risks

Published

on

In order to better assess flood hazards, hazard maps should include historical data. This is what researchers at the CEDIM – Center for Disaster Management and Risk Reduction Technology at the Karlsruhe Institute of Technology (KIT) are advocating. CEDIM has presented a first report on the flood disaster in Rhineland-Palatinate and North Rhine-Westphalia. Regarding the role of climate change, the combination of more available water in the atmosphere and increasing persistence of large-scale weather patterns holds an increasing potential for extreme precipitation events.

Last week’s flood disaster claimed more than 170 lives in Germany (as of July 21, 2021). People are still missing. The damage to buildings and infrastructure can only be roughly determined and is in the double-digit billions – of which at least two billion euros alone for transport infrastructure. In the meantime, the German Insurance Association (GDV) has calculated the insured damage to buildings and infrastructure. (GDV) has estimated the insured damage at four to five billion euros in Rhineland-Palatinate and North Rhine-Westphalia alone. How did the floods, which mainly affected Rhineland-Palatinate and North Rhine-Westphalia, come about? How can flood hazards – especially rare, extreme events – be better estimated in advance? These are the questions that CEDIM’s Forensic Disaster Analysis (FDA) Group has been addressing, and it has produced its first report.

As the researchers explain, enormous amounts of precipitation led, for example, to the water level at the Ahr (Altenahr) significantly exceeding its previous record of 2016 (3.71 meters, discharge: 236 m³/s). However, due to flooding, the gauging station failed at a value of 5.05 meters (discharge: 332 m³/s). The Rhineland-Palatinate State Office for the Environment used model calculations to calculate a level of up to seven meters for the night of the catastrophe; based on this, the experts estimated a discharge of between 400 and 700 m³/s.

Several factors led to the extremely high precipitation totals

From a meteorological perspective, several factors led to the extremely high precipitation totals. In addition, the highly indented terrain of the affected regions, especially in the district of Ahrweiler, with partly deeply incised river valleys, increased the surface runoff. The already nearly saturated soil due to partly heavy precipitation in the preceding days further aggravated the situation.

 

“Within 48 hours, more rain fell in parts of North Rhine-Westphalia and Rhineland-Palatinate than usually falls there in the entire month of July; the majority even fell within only about ten hours.”

– Professor Michael Kunz, CEDIM Spokesperson

 

To estimate the flooded areas in the hardest-hit areas of Kreis Ahrweiler and Rhein-Erft-Kreis, the research team combined satellite data with aerial photos from (amateur) drones and helicopters, as well as photos from social media. According to these estimated flooded areas, there are just over 19,000 buildings in the affected areas with a value of around nine billion euros. Combined with empirical data from past flood disasters (infrastructure damage, natural hazards, and other damage), the researchers estimated total damage between eleven and 24 billion euros (first CEDIM estimate: July 21, 2021). It should be noted, however, that flooded areas represent only a portion of the total affected area.

More available water in the atmosphere and increasing persistence of large-scale weather patterns increase risk

According to the Karlsruhe disaster researchers, whether a single extreme event or the sequence of several extremes can already be attributed to climate change can neither be precisely proven nor completely denied, especially when it comes to events on short time and spatial scales that are strongly influenced by local factors. However, for the large-scale processes in the atmosphere that lead to the development of extreme events, the following is true: The combination of more available water in the atmosphere as a result of temperature increase and an increasing persistence of large-scale weather patterns with a tending northward shift of the jet stream, the strong wind band in the upper troposphere, has a high hazard potential. “As a positive trend is expected for these three factors, the potential for extreme precipitation events will also increase in the future,” Kunz explains.

Significant flood events in the Ahr Valley as early as 1804 and 1910

“There have already been two particularly significant flood events in the Ahr Valley in the past, in 1804 and 1910, but a comparison with historical records suggests that this year’s values should be classified lower than those of 1804,” says CEDIM deputy spokesperson Dr. James Daniell. For the 1804 flood event, the discharge was already estimated at about 1,100 m³/s by the University of Bonn. This year’s event may have been hydrologically similar in magnitude to the 1910 event with a discharge of 500 m³/s. “The current flood maps for the Ahr valley are currently based on discharge statistics with data since 1947, as homogeneous measurement series have been available since that time. However, this means that the two historical events have not yet been taken into account in the hazard assessment,” says Dr. Andreas Schäfer, lead author of the report. For example, the current estimate of a hundred-year flood as a design basis for flood protection for the Ahr River is 241 m³/s.

CEDIM’s FDA Group urges the inclusion of historical data in flood hazard maps, including data from before continuous measurement records, to better assess flood hazards. “Admittedly, when analyzing and interpreting the data, we must generally keep in mind that both infrastructures and flood protection measures have changed in recent years. As a result, it’s harder to compare readings directly, and we should focus less on water levels,” Daniell explains. “We can use gauge levels from 1804 and 1910 as indirect indicators to identify flood years. However, measured data on discharge, on trends over time, and on precipitation totals are more important for interpretation. Ultimately, however, both historical variables – gauges and discharge – should be included when developing hazard maps.”

Continue Reading

News Plant Construction, Engineering & Components

Delivery of two Biogas Plants to Japan

Published

on

Currently, WELTEC BIOPOWER is setting up two agricultural 250-kW biogas plants for one of Japan‘s major milk producers. One of the plants is being set up in Urahoro on Japan‘s island of Hokkaido. The second plant is being built in Sakata in the prefecture of Yamagato on Honshu, the largest island. The structural design of the two biogas plants takes the earthquake risk in these regions into consideration. The generated power and heat will be used directly on site in order to enable energy autonomy. The commissioning will take place in summer 2021 in Urahoro and in autumn 2021 in Sakata.

Following the Fukushima nuclear disaster in March 2011 and thanks to the support of renewable energies, biogas enjoys a good reputation in Japan. Among the renewable energies, biogas is considered to be a weather-independent energy source that makes a significant contribution to the required grid stability. Additionally, the preconditions for the development of biogas are favourable, since despite the limited availability of other raw materials, Japan boasts plenty of biomass potential. Efforts to promote biogas projects had already started in 2002. A short while thereafter, WELTEC built its first „Made in Germany“ plant in Japan. However, the pace of development in this area picked up only after the government introduced the feed-in tariff for green energy in July 2012.

The companie’s latest biogas projects in Japan are hybrid dairy farms. This means that the embryos of special beef cattle breeds are transferred to dairy cows, allowing the farm to produce both milk and beef. Every year, the two locations of an agricultural company group yield approximately 30,000 t of liquid cattle manure, which will be used for the energy production in the anaerobic digestion plants. To ensure efficient digestion, WELTEC BIOPOWER is setting up one stainless-steel digester in Urahoro. In Sakata, the concern is building two digesters, as the animal headcount will soon be increased. With a height of 6.3 m and a diameter of 25.34 m, the three bioreactors will each have a capacity of 3,176 m³. The benefits of stainless-steel tanks include compact shipping in just a few containers from Europe to Japan and easy adaptation to the structural requirements in earthquake regions.

At the Urahoro site on Hokkaido, the liquid substrates will be pumped to the digester from three upstream storage tanks. Two of the three pre-storages are already in place, but are being furnished with state-of-the-art technology. WELTEC is building the third pre-storage tank with a capacity of 393 m³ from scratch. Its height is 5.03 m, and its diameter measures 9.98 m. A pre-storage of the same size is also being set up in Sakata. Due to the cold winters with a lot of snow, the prestorage tanks at the two locations will be insulated and furnished with gas-tight double-membrane roofs. Additionally, the company is setting up a digestate storage tank with a capacity of 524 m³ for each location. Following the separation, the digestate will be spread on the company‘s own fields as fertiliser. Apart from the digesters, upstream and digestate storage tanks, separation and pump technology, they are also setting up a 250-kW CHP unit at each of the locations.

Based on the customer’s specification, the plants will run in parallel grid operation. Therefore, both construction projects are viewed as pilot projects in Japan. The fact that the power will not be fed into the grid, but will be used for the rotary milking parlour and other facilities, makes the operator more independent from the power grid.

This makes sense from an economic perspective, as the grid capacity and stability in Japan is endangered especially in the earthquake areas. The fact that the framework conditions for the development of bioenergy are favourable is a great advantage: The yearly biomass potential in Japan amounts to approximately 284.4 million t, enough to produce about 13 billion kWh of electricity and continually supply 2.8 million households. At the bottom line, the efficient utilisation of raw material in biogas plants such as in Urahoro and Sakata contributes to the economic viability, eco-compatibility and security of supply and thus to the success of the energy transition in Japan.

Continue Reading

Plant Construction, Engineering & Components Videos

Complete line products
Dimension reduction at the control cabinet

Published

on

Dimension reduction at the control cabinet with COMPLETE line products Phoenix Contact

Saving space in the control cabinet is an important issue for control cabinet builders. In times of increasing functionality, more and more products have to be placed in the control cabinet. At the same time, plants and machines have to become more compact and space-saving. Of course, this also applies to the control cabinets that drive the machines. But how can all the necessary products be placed in such a small box? Fortunately, the Complete line from Phoenix Contact offers clever solutions that implement full functionality in the smallest of spaces.

Continue Reading