Gea has worked with Almarai Company in Saudi Arabia to build the nation’s largest and most modern dairy processing facility. The new plant at Al Kharj includes multiple production lines for a wide range of milk and yoghurt products. It has the capacity to process two million liters of milk a day. The project has already been successfully completed and the plant is in operation.
Key features of the plant at Al Kharj include separators with integrated direct drive that have fewer moving parts and so reduce friction losses. They also use asynchronous motors that are extremely robust for maximum machine availability. To reduce the environmental impact and energy consumption, the plant is equipped with the firm’s latest energy recovery technology.
Furthermore, the company has built in the latest control systems and operating protocols in line with Industry 4.0. These include the interoperability of the equipment, the transparency of information, autonomous decision making where possible and the highest level of technical assistance. Gea’s Management Execution System captures data such as KPIs and utilization levels to allow comprehensive monitoring of the entire plant operations and energy usage. The plant also features end-to-end track and trace for ultimate quality control and a plant-wide uninterruptable power supply.
Biogas technologies for production of biomethane
The untapped feedstock potential for biomethane production in Spain is very large as the country has a very strong food...
Read more